Tangshan Iron and Steel Group Company
Basic customer needs:
The long process for steel customers includes:
Production processes such as sintering, pelletizing, blast furnace, converter, hot blast furnace, heating furnace, lime kiln, etc.
Flue Gas Treatment Procedure:
Electrostatic precipitator, CFB, SCR, bag type dust removal, etc.
CEMS system:
SCS-900, LV-EM-1000, CEMS-2000, and other cold dry and hot wet systems.
1. Based on customer needs, we propose an "online monitoring and precise management overall consultation" service for customers, which includes: full site investigation services, key production process "four simultaneities" diagnostic services, third-party service supervision and assessment, and customized professional knowledge training services.
2. Based on the on-site site investigation, many rectification suggestions have been proposed regarding the standardization of CEMS installation and the performance of third-party service units; Based on the analysis of CEMS operation, some points have the following situations.
Full calibration failed。
Based on a detailed analysis of the above situation, it was found that the main cause of the problem is the influence of ammonia and moisture in the exhaust gas; To this end, we propose to the customer a solution of installing a pre treatment system for ammonia removal and dehumidification at the original position of the probe.
3. After the customer adopted the above suggestions, the PreGASS2500+PreGASS9500 ammonia removal and dehumidification pre-treatment system was installed at the relevant problem location, and the effect was significant, fully meeting the HJ75/76-2017 standard. The actual effect is as follows: